stochastic simulation method meaning in Chinese
随机模拟法
Examples
- Sedimentary facies modeling use the monte carlo stochastic simulation method based on geostatistics
沉积相建模采用以地质统计学为基础的蒙特卡罗随机模拟方法。 - The many proper limited water levels were study out through analyzing the engineering condition and safe operation instance of the reservoir ; the stochastic simulation method and frequency analysis method were adopted to calculate the flood control risk rate of reservoir at the different limited water levels
通过分析水库的工程条件与安全运行情况,拟定了可能的汛限水位方案集,采用随机模拟和频率分析的方法计算出了水库在各种汛限水位方案下的防洪风险率。 - After analyzing the character of risk , i introduce data mining method into risk management , to solve the contradiction between great capacity of data and lack of information , the methods include mathematics statistics and artificial neural network ( ann ) . then , i study on the methods of risk management in risk identification , risk evaluation and risk disposal , what is advanced , fault tree analysis method based on fuzzy probability , stochastic simulation method and the topsis method based on interval number all consider the characteristic of risk . finally , i discussed the application of information system ( mis ) in project risk management , and developed a risk management information system
论文在深入分析了风险特征之后,将数据挖掘技术引入风险管理,用以解决海量数据与贫乏信息之间的矛盾,所采用的技术有数理统计和人工神经网络( ann )两种方法;接着,论文对风险识别、风险评价、风险处理中的风险管理方法进行了研究,所提出的基于模糊概率的故障树技术、随机模拟技术和基于区间数的topsis方法都体现了风险管理的特点;最后,论文对信息系统( mis )在工程项目风险管理中的应用进行了探讨,开发出一个风险管理信息系统。